Publikace UTB
Repozitář publikační činnosti UTB

Environmental management system as the part of the methodology for optimization of assembly workplaces

Repozitář DSpace/Manakin

Zobrazit minimální záznam


dc.title Environmental management system as the part of the methodology for optimization of assembly workplaces en
dc.contributor.author Šišková, Veronika
dc.contributor.author Dlabač, Jaroslav
dc.relation.ispartof International Journal of Mathematical Models and Methods in Applied Sciences
dc.identifier.issn 1998-0140 Scopus Sources, Sherpa/RoMEO, JCR
dc.date.issued 2013
utb.relation.volume 7
utb.relation.issue 4
dc.citation.spage 428
dc.citation.epage 435
dc.type article
dc.language.iso en
dc.publisher North Atlantic University Union (NAUN) en
dc.relation.uri http://www.naun.org/main/NAUN/ijmmas/2001-128.pdf
dc.subject Design of manufacturing systems en
dc.subject Environmental management system en
dc.subject Ergonomic en
dc.subject Labor productivity en
dc.subject Lean manufacturing en
dc.subject Optimization en
dc.description.abstract The Optimization of assembly lines is a daily problem for all manufacturing companies. The most common optimization problem is the cost of the product being manufactured in the form of human labor. Activities related to the optimization of assembly workplace are not static, but can be managed through the "spontaneous". The article is focused not only on the evaluation of assembly lines in terms of productivity, but also the perspective on environmental aspects operators. This article described individual steps how the methodology could be created. There are described qualitative and quantitative research which were used and then was designed the methodology of optimization of assembly workplaces based on used procedures the integral methods This article looked at designing methodology with respect of environmental aspects. Of course, the human factor plays the most important role in final methodology. In every phase there is considered human work and its responsibility. This article described the preparation phase, the phase of analysis, the phase of optimization and the improvement phase. Of course, in every phase it was recommended to use the methods of modern ́s industrial engineering as well as the methods for improving a managing environmental system. The methodology was design primarily for the assembly workplaces. Nevertheless, the methodology could be used for optimization of any sort manufacturing workplaces. en
utb.faculty Faculty of Management and Economics
dc.identifier.uri http://hdl.handle.net/10563/1003253
utb.identifier.obdid 43869781
utb.identifier.scopus 2-s2.0-84878104225
utb.source j-scopus
dc.date.accessioned 2013-07-27T14:54:24Z
dc.date.available 2013-07-27T14:54:24Z
utb.contributor.internalauthor Šišková, Veronika
utb.contributor.internalauthor Dlabač, Jaroslav
utb.fulltext.affiliation V. Siskova, J. Dlabac V. Šiskova is with the Faculty of Management and Economics, Thomas Bata University in Zlín, Mostní 5138, Zlín 760 01, the Czech Republic (corresponding author to provide phone: +420 737 959 389; veronica.siskova@ centrum.cz). J. Dlabac is with the Faculty of Management and Economics, Thomas Bata University in Zlín, Mostní 5138, Zlín 760 01, the Czech Republic (corresponding author to provide phone: +420 724 431 540; Jaroslav.Dlabac@e-api.cz). C. Author is with the Electrical Engineering Department, University of Colorado, Boulder, CO 80309 USA, on leave from the National Research Institute for Metals, Tsukuba, Japan (e-mail: author@nrim.go.jp).
utb.fulltext.dates -
utb.fulltext.sponsorship This paper is one of the research outputs of the project “Metodika optimalizace montážních pracovišť v českých podnicích” registered at “IGA/FaME/2012/017”.
utb.fulltext.faculty Faculty of Management and Economics
utb.fulltext.ou -
Find Full text

Soubory tohoto záznamu

Zobrazit minimální záznam