dc.title | Heuristic control of the logistic manufacturing system with regeneration of tools: The simulation case study | en |
dc.contributor.author | Chramcov, Bronislav | |
dc.contributor.author | Bucki, Robert | |
dc.contributor.author | Kukkonen, Saku | |
dc.contributor.author | Korjenic, Azra | |
dc.relation.ispartof | International Journal of Mathematics and Computers in Simulation | |
dc.identifier.issn | 1998-0159 Scopus Sources, Sherpa/RoMEO, JCR | |
dc.date.issued | 2014 | |
utb.relation.volume | 8 | |
utb.relation.issue | 1 | |
dc.citation.spage | 9 | |
dc.citation.epage | 18 | |
dc.type | article | |
dc.language.iso | en | |
dc.publisher | North Atlantic University Union (NAUN) | |
dc.relation.uri | http://www.naun.org/main/NAUN/mcs/2014/a042002-184.pdf | |
dc.subject | Control algorithms | en |
dc.subject | Heuristic algorithm | en |
dc.subject | Manufacturing strategies | en |
dc.subject | Manufacturing system | en |
dc.subject | Mathematical modelling | en |
dc.subject | Optimisation criteria | en |
dc.description.abstract | The paper highlights the problem of mathematical modelling and the subsequent simulation of the complex logistic manufacturing system with regeneration of tools. The system itself consists of identical parallel manufacturing subsystems in which there is a certain number of production stands arranged in a series. Each stand can carry out an operation on the specific order with the use of a dedicated tool. Tools can be regenerated a limited number of times only. Heuristic algorithms are implemented in order to control the choice of the order or the choice of the required stands in the discussed manufacturing system. Manufacturing criteria are used to evaluate implemented control algorithms. The simulator which was created for the purpose of this work is used for obtaining certain result data which is subsequently analysed thoroughly in order to evaluate the simulation case study. | en |
utb.faculty | Faculty of Applied Informatics | |
dc.identifier.uri | http://hdl.handle.net/10563/1003730 | |
utb.identifier.obdid | 43871672 | |
utb.identifier.scopus | 2-s2.0-84900350285 | |
utb.source | j-scopus | |
dc.date.accessioned | 2014-06-05T20:22:52Z | |
dc.date.available | 2014-06-05T20:22:52Z | |
utb.contributor.internalauthor | Chramcov, Bronislav | |
utb.fulltext.affiliation | Bronislav Chramcov, Robert Bucki, Saku Kukkonen, Azra Korjenic B. Chramcov is with the Tomas Bata University in Zlin, Faculty of Applied Informatics, nam. T.G. Masaryka 5555, 760 01 Zlin, Czech Republic (e-mail: chramcov@fai.utb.cz). R. Bucki is with the Institute of Management and Information Technology, ul. Legionów 81, 43-300 Bielsko-Biała, Poland (e-mail: rbucki@wsi.edu.pl) S. Kukkonen is with the Lappeenranta University of Technology, Department of Mathematics and Physics, P.O. Box 20, FI-53851 Lappeenranta, Finland (e-mail: saku.kukkonen@lut.fi). A. Korjenic is with the Vienna University of Technology, Institute of Building Construction and Technology, A-1040 Vienna, Austria (e-mail: azra.korjenic@tuwien.ac.at) | |
utb.fulltext.dates | Manuscript received August 30, 2013 | |